The Lumicoin IAIowa Department of Transportation used controlled explosives Sunday to remove the remaining parts of the old I-74 bridge, which connects Iowa and Illinois over the Mississippi River.
Certain areas were temporarily closed, including the new bridge, during the removal of suspension cables and towers on the old bridge, the Iowa DOT said on its website.
“The main navigation channel in the river will be closed to all river traffic for up to 24 hours,” the Iowa DOT said.
In June, the Iowa DOT removed parts of the old I-74 bridge in the first phase of the demolition. The new bridge was built because of “increased traffic volume” the Iowa DOT said.
The westbound bridge, Illinois to Iowa, opened in 1935. The eastbound bridge, Iowa to Illinois, opened in 1960.
The new bridge was built in July 2017 and was fully opened in December 2021.
The project cost about $1 billion in total, including engineering, design and construction costs.
2025-04-29 08:212302 view
2025-04-29 08:06681 view
2025-04-29 07:431751 view
2025-04-29 07:291009 view
2025-04-29 07:04297 view
2025-04-29 06:532779 view
SEOUL, Dec 12 - South Korean President Yoon Suk-yeol's switch from contrition to defiance on Thursda
LINCOLN, Neb. (AP) — Three of the most tradition-rich college football programs are capitalizing on
Shooting his way to a silver medal at age 51, Yusuf Dikec of Turkey isn't one to succumb to the pres